Solar label kit builder

Build a Canadian solar PV label kit in your browser, one question at a time. Tell it where the job is and what kind of system it is, and it puts together the plates the Code and your utility ask for. Or go through every plate published for your province and pick them yourself, with your own wording, size and finish on any plate you add. You get a price and an artwork proof by email, and nothing is engraved until you approve it.

Provinces covered: Ontario, British Columbia, Alberta, Saskatchewan, Manitoba, Nova Scotia, New Brunswick, Newfoundland & Labrador, Prince Edward Island, Yukon, Northwest Territories, Nunavut, and a generic Canadian CEC baseline. Quebec is not offered. Hydro-Québec's wording exists only as a translation whose own notice says the French governs.

What it covers: photovoltaic warning signs, DC and AC disconnect identification, ungrounded-conductor warnings, rapid-shutdown and first-responder placards, interconnection and single-line diagram plates, utility disconnect tags, energy-storage and ESS plates, arc-flash marking for non-dwellings, and the jurisdiction-specific plates Nova Scotia Power, Hydro One and Toronto Hydro require.

Worded to the Canadian Electrical Code C22.1:24 Section 64 and the interconnection standard of the utility serving the job. Engraved in Burlington, Ontario the same day the proof is approved, then shipped anywhere in Canada.

More about the builder · The Section 64 code reference · What each province adds · [email protected]