This is the base set, before your province and your local utility add to it. How
many of each you need depends on the job: the number of inverters, points of interconnection,
combiners, disconnecting means and transformers, plus any field-assembled equipment that has no
manufacturer’s nameplate.
64-200
Photovoltaic warning sign — capitals at least 9.5 mm high, white on red (64-200(3))
PV system disconnecting means
64-060(1)(h)
84-024(1)(i)
Warning that terminals stay energized with the switch open
Every disconnecting means
64-066(7)
64-068(1)(b)
Ungrounded conductor warnings
DC circuits — string and central inverter jobs
64-074
Identification of the disconnecting means
Each disconnect
64-076(3)
64-902(1)
Building supplied from other sources — site plan
Service equipment / meter
64-076(3)
2021: 64-074(4)
Renewable energy system contains electrical energy storage devices
Service disconnect and meter, where storage is present
64-112(4)(c)
Do-not-relocate marking on the overcurrent device
Panelboard with a supply-side connection
64-218(7)
Label stating the PV system is equipped with rapid shutdown
Supply-authority meter and the consumer’s service equipment
84-024(1)(i)
Warning that the utility disconnect's terminals stay energized with it open — the 64-060(1)(h) plate. The “DO NOT LOCK” wording is Manitoba Hydro's only: every other utility wants a disconnect it can lock open
Utility disconnecting means
84-030(1)
Interconnected photovoltaic power source marking
Supply-authority (utility) disconnect and meter location
84-030(2)
Single-line diagram of the interconnected system
At the service — an 11″ × 8.5″ plate
14-414(3)
64-112(4)(d)
Multiple power supplies warning
Panelboard fed from more than one source
2-306
Arc-flash marking — “other than dwelling units”
Commercial and industrial only
8-106
Do-not-adjust marking — “Do not adjust settings” (Manitoba TI 8-106 A)
Adjustable overcurrent devices
C22.2 No. 107.1
Cl. 15.4.1.1
Utility-interconnected inverter marking
Inverter, where not factory-marked