Manitoba · Manitoba Hydro

Manitoba solar label kits

Manitoba Hydro is the only utility in Canada that requires an engraved lamacoid by name. Informative Bulletin 64-0 states that solar photovoltaic labels are to be engraved lamacoids, red background with white lettering. Everywhere else it is an accepted example. Here it is the requirement.

House — string inverter
21 plates

276 square inches of phenolic. Microinverters are 17 plates.

Plates with published wording
14

Second only to Saskatchewan, and the wording is the utility's own.

Product named in the document
Lamacoid

Red background, white lettering, engraved. IB 64-0 says so outright.

The one document that names the product

Why it matters

Across the rest of Canada a printed vinyl label can satisfy an inspector, because the Code asks for permanence and legibility and lists lamacoid as one way to get there. Manitoba Hydro removed the choice. In its territory a printed label is not a cheaper option — it is the wrong product.

That single sentence in Informative Bulletin 64-0 is the strongest labelling requirement published by any Canadian utility, and it is the reason a Manitoba job is the easiest one on this site to specify: there is nothing to argue about.

The site plan

Manitoba is also unusual in what it asks the plates to show. Two of the twelve are locators rather than warnings — a meter location and service box diagram, and a callout that tells a responder where the utility disconnect actually is. Those carry job-specific content, so they cannot be stocked and cannot be guessed. Send the site plan with the order.

What we still won't claim

That an engraved lamacoid from us is code compliant, CSA approved or guaranteed to pass. Manitoba Hydro's bulletin describes a product, and we make that product to its description. Approval attaches to the installation as inspected, never to a plate in a bag.

Plates that need data

The locator plates and the disconnect identifiers carry blanks — voltages, currents, locations. The builder asks for those values and engraves them. An inspector is entitled to refuse a Sharpie.

The 14 plates Manitoba Hydro words for you

Manitoba plates with published wording
Plate & ruleWhere it goes
Multiple power supplies
14-414(3) · 64-112(4)(d)
Inverters and equipment fed from two sources - one per source disconnect, or one label indicating multiple disconnects must be opened.
AC disconnect - shock hazard, two sources
64-060(1)(h) · 84-024(1)(i)
All AC disconnects supplied from two sources of power, and every energy storage system disconnecting means (CEC 2024 Rule 64-914).
Ungrounded DC conductors
64-068(1)(b) · 64-066(7)
DC combiners, DC junction boxes, DC disconnects and inverters - ungrounded systems only.
Photovoltaic AC disconnect marking
64-074(1)
Each interconnecting AC power source - AC disconnects for inverters, panelboards, splitters.
Meter location and service box diagram
64-076(3) · 64-902(1)
At the meter location and service box.
Energy storage system warning
64-076(3)
At renewable-energy systems containing electrical energy storage.
Backfed breaker - do not relocate
64-112(4)(c)
At the PV input breaker in the electrical panelboard.
Photovoltaic DC disconnect marking
64-200(1)
String inverters - PV output circuit DC disconnect, at an accessible location.
Rapid shutdown at the DC disconnect
64-200(2)
At the disconnecting means for the photovoltaic output circuit.
Rapid shutdown placard at meter and service equipment
64-218(7)
At the supply authority meter location and the consumer's service equipment location. On buildings without exterior metering the location may need to be agreed with the local fire department.
Building source and disconnect location placard
64-076(3) · 64-902(1) (also shown by SK24 under 64-218(7) and 84-030(2))
At the supply authority meter location and the consumer's service equipment.
Utility disconnect - do not lock
84-024(1)(i)
At the utility disconnect.
Interconnected system warning notice
84-030(1)
At the utility disconnect and the meter location.
Utility disconnect location callout
84-030 / MB TI 64-112 B (Manitoba)
At the meter socket, where the utility disconnect is permitted to be located other than adjacent.

Rule numbers are printed as the source document writes them, and most provincial and utility standards were drafted against the 2021 Code. Nine Section 64 numbers changed in C22.1:24 — the renumbering is here.

Manitoba kits

Manitoba solar label kits
JobPlates hereOntario
House — string inverter2120
House — microinverters1716
House — with battery2524
Commercial rooftop3029
Ground mount / solar farm3231
Off-grid / cabin1515
Re-label an existing install87