Engraved in Burlington, Ontario · Ships across Canada

Cart Build your kit
The plates that carry content

Solar placards

A Canadian solar placard is a larger laser-engraved acrylic lamacoid plate (often up to about 11×8.5 in for a single-line diagram) that marks the whole PV install: rapid shutdown, disconnect locations, interconnection diagram. Mounted at the meter, service, or building exterior per CEC Sections 64/84 and the utility. Confirm the adopted edition and the AHJ. Solar Labels engraves them province-worded from Burlington, Ontario.

A label identifies a switch. A placard tells someone who has never seen the building what is on the roof, where it shuts off and what is still live after they open it. 9 of them sit in a Canadian solar kit, and they are the ones a fire crew reads at three in the morning.

Placards in the base set
9

Of 58 plates in the national catalogue.

Diagram size
11″ × 8.5″

279.4 × 215.9 mm. The diagram plates need the area; a 4 × 1 tag cannot carry a drawing.

Carry job data
Most of them

Locations, voltages, a single-line drawing. None of them can be stocked blank.

Placard, label, tag: the difference on a Canadian job

Placard

Mounted where a responder or an inspector will look first: the service, the meter, the building exterior. It carries information about the whole installation rather than the one device it is screwed to: the single-line diagram, the rapid-shutdown notice, the location of the disconnect. Big: 11″ × 8.5″ for the diagrams, 5″ to 7″ wide for the rest.

Label

A warning or an identification on one piece of equipment. “PV AC DISCONNECT”. “TERMINALS ON BOTH LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION”. Mostly 5″ × 1.5″ and 5″ × 2″.

Lamacoid

A material and a process, rather than a kind of sign. Engraved two-layer acrylic, cut through a coloured cap layer into a contrasting core, so the legend is the substrate rather than ink on top of it. Both placards and labels are made as lamacoids on a Canadian solar job because that is what survives outdoors. More on solar lamacoids →

The first-responder placard

Rule 64-218(7) of C22.1:24 (renumbered from 64-218(6)) calls for a label stating that the PV system is equipped with rapid shutdown, at the supply-authority meter and at the consumer's service equipment. It is the single most commonly missed plate in a residential kit, because a homeowner never sees it and the installer is already off the roof by the time anyone asks.

From the fire authority

Two of the placards below come from the fire authority rather than from C22.1: array boundary marking and the emergency shutdown procedure. Whether they are asked for depends on the municipality, so the builder treats them as questions rather than defaults.

Every placard in the national set

Solar placards in the CEC base set
Plate & ruleWhere it goes
Meter location and service box diagram
64-076(3) · 64-902(1)
At the meter location and service box.
Rapid shutdown placard at meter and service equipment
64-218(7)
At the supply authority meter location and the consumer's service equipment location. On buildings without exterior metering the location may need to be agreed with the local fire department.
Building source and disconnect location placard
64-076(3) · 64-902(1) (also shown by SK24 under 64-218(7) and 84-030(2))
At the supply authority meter location and the consumer's service equipment.
Single-line diagram of the interconnected system
84-030(2) · 64-218(6) · 64-104(5)
Conspicuous location at the supply authority disconnecting means; NSP also requires it inside at the main service panel and any PV sub-panels.
Energy storage, building placard
64-902(1)
On the building or structure containing the energy storage system.
Firefighter / first-responder placard
Good practice
At the main entrance or service entrance, per the fire authority.
Emergency shutdown procedure
Good practice
At the main service disconnect and the inverter.
Array boundary / roof marking
Good practice
At the array boundary and roof access points.
Photovoltaic power source placard
Good practice
At the meter base / service equipment as directed by the utility.

Rule numbers are printed as the source document writes them, and most provincial and utility standards were drafted against the 2021 Code. Nine Section 64 numbers changed in C22.1:24. The renumbering is here.

Solar placard questions

What is a solar placard?

A Canadian solar placard is a larger engraved plate (often up to about 11×8.5 in for a single-line diagram) that marks the whole PV install (rapid shutdown, disconnect locations, interconnection diagram) at the meter, service, or building exterior, per CEC Sections 64/84 and the utility (confirm AHJ). Also called a PV placard or solar plaque.

Which solar placards does a Canadian install need?

The national base set has 9 placards. The ones almost every grid-tied job carries are the rapid-shutdown placard at the service (C22.1:24 Rule 64-218(7)) and the single-line diagram of the interconnected system at the service equipment (Rule 84-030(2)). Array boundary marking and an emergency shutdown procedure come from the fire authority and depend on the municipality. Your province and utility can add more.

Are solar placards engraved or printed?

Either can be acceptable: ESA Bulletin 64-5-5 asks for labels that withstand the elements and stay permanent and legible, and gives lamacoid and engraved metal as examples. Manitoba Hydro requires engraved lamacoids outright. Solar Labels engraves every placard as a lamacoid, with the job's own values cut in rather than written on.

What is a rapid shutdown placard on a Canadian solar install?

On Canadian PV jobs where Rule 64-218 applies, C22.1:24 Rule 64-218(7) calls for a permanent label stating the system is equipped with rapid shutdown, at the supply-authority meter and at the consumer's service equipment. Confirm the adopted edition and the AHJ. Some buildings without exterior metering need fire-department agreement on location. Solar Labels engraves this as an acrylic lamacoid with the job's wording cut in.

Where does the rapid shutdown placard go?

At the supply-authority meter location and at the consumer's service equipment, per C22.1:24 Rule 64-218(7) when that rule applies. On buildings without exterior metering, agree the spot with the local fire department. Array-boundary and emergency-procedure plates are fire-authority / municipal asks rather than Code defaults. Confirm AHJ.