Kit builder

Build your kit in the browser

One question at a time, in plain words. Tell us where the job is and what kind of system it is, and the plates come out — or go through every verified Canadian plate for your province and pick them yourself. You get a price and an artwork proof by email. Nothing to install, no account, and nothing is engraved until you approve the proof.

01 — Answer
Or pick them yourself

Say where the job is and what kind of system it is and the plates for it come out. Or take the other route and go through the province’s full set as finished artwork, choosing what you want with a quantity on each.

02 — Your own plates
Your wording, your finish

Add plates worded by you, a line at a time, and choose the size, the corners, the mounting holes and whether the edge is bevelled. The picture beside it is what gets engraved.

03 — Price and proof
By email, before anything is cut

A price and an artwork proof land in your inbox with the real engrave geometry. Approve the proof and we cut from that same file.

What NEEDS DATA means

Some plates carry blank fill-in rules — operating voltage, disconnect location, equipment ID. The builder lets you type those values in and engraves them, rather than shipping a plate for someone to fill in with a pen. An inspector is entitled to refuse a Sharpie.

Where the wording comes from

Each province gets its own plate wording. Saskatchewan, Manitoba and Nova Scotia publish theirs; most provinces publish none, so those plates carry another province’s wording by analogy and are sold as built to your inspector’s specification. The full breakdown is here.

Prefer to send the drawing?

Email the single-line with the province, the local distribution company, the inverter make and count, and whether there is storage. We will build the schedule and send it back.

[email protected]
+1 289-275-9572

What is actually in it

58 plates in the national set and every jurisdiction's variations on top — Saskatchewan's 21 verbatim plates, Manitoba's 14, Nova Scotia's 10, Ontario's ESA additions and Edmonton's two. Seven job types, from 7 plates on a service re-label to 31 on a ground mount, depending on province.

Quebec

We do not currently sell into Quebec. Hydro-Québec’s wording exists only as a translation whose own notice says the French governs, in a province that regulates the language of safety labelling. The builder will not add those plates.