Get started

Tell us the install

Send the single-line, or just answer the five questions below in an email. You get back the label schedule with a rule citation on every plate, a firm price and a ship date — not a callback request.

What to send

1 · Province and the local distribution company. The province sets the base rule set; the LDC adds its own plates and can override the colour.

2 · Grid-tied or off-grid. Grid-tied pulls in the whole interconnection block.

3 · Inverter type. String or central versus microinverters or AC modules — the single biggest swing in the kit.

4 · Battery storage. Yes or no, and whether the ESS is multi-part.

5 · Dwelling or commercial. Arc-flash marking applies to everything except dwelling units.

Inverter count, points of interconnection, combiners and disconnecting means set the quantities. A photo of the panel and the single-line covers most of it.

Contact

[email protected]
+1 289-275-9572
Burlington, Ontario · ships Canada-wide

What you get back

The label schedule with rule, jurisdiction and install location per plate; a nested cut sheet; a firm price at $1.14/sq-in; and a flag list of every blank that has to be filled from the job before cutting.

The kit is the default, not the drawing. It doesn’t replace your stamped drawings or the inspection.