Engraved in Burlington, Ontario · Ships across Canada

Cart Build your kit
Engraved shock hazard plate for two sources of supply
Saskatchewan · TSASK & SaskPower

Saskatchewan solar label kits

Saskatchewan publishes more verbatim label wording than any other province, and it is enforceable rather than advisory. It is also the reason a Saskatchewan house kit engraves 1.8 times the area of the same kit in Ontario.

House, string inverter
525 sq in

20 plates. The same house kit engraves 287 square inches in Ontario.

Plates with published wording
21

The largest set of verbatim wording of any Canadian jurisdiction.

Minimum capital height
9.5 mm

CEC Rule 64-200(3), on the photovoltaic warning sign. TSASK applies it to the word WARNING.

Why the kit is bigger

Longer wording, bigger plates

Most provinces leave the text of a Section 64 plate to the inspector, so it is engraved as short as it can legibly be. TSASK publishes the sentence. Where the published sentence runs long, the plate has to grow to carry it at a legible capital height, and engraved plates are priced by area.

That is the whole explanation for 525 square inches against Ontario's 287 for the same house kit. The difference is square inches, and the builder prices them.

Where it comes from

TSASK Appendix M is the current set of Saskatchewan interpretations of the 2024 CEC. SaskPower's Electrical Service Requirements Rev. 3 governs the interconnection side.

The 9.5 mm figure

Capitals at least 9.5 mm high, white on red, on the photovoltaic warning sign. That is CEC Rule 64-200(3), and TSASK's Appendix M reproduces it word for word. TSASK's 2024 interpretations apply the 9.5 mm to the word WARNING. The figure comes from the Code, so it holds outside Saskatchewan too, though there the inspector decides how it is applied.

What that means for your kit

Our Saskatchewan set engraves WARNING at 9.5 mm. Plates for other provinces are laid out to each plate's published letter height. If your inspector wants 9.5 mm headings, tell us and we will cut them larger.

The 21 plates TSASK words for you

On these, the engraved text is Saskatchewan's own. The rest of the kit is worded to your inspector's specification and flagged that way on the schedule.

Saskatchewan plates with published wording
Plate & ruleWhere it goes
AC disconnect, shock hazard, two sources
64-060(1)(h) · 84-024(1)(i)
All AC disconnects supplied from two sources of power, and every energy storage system disconnecting means (CEC 2024 Rule 64-914).
Ungrounded DC conductors
64-068(1)(b) · 64-066(7)
DC combiners, DC junction boxes, DC disconnects and inverters: ungrounded systems only.
Photovoltaic AC disconnect marking
64-074(1)
Each interconnecting AC power source: AC disconnects for inverters, panelboards, splitters.
Energy storage system warning
64-076(3)
At renewable-energy systems containing electrical energy storage.
Backfed breaker, do not relocate
64-112(4)(c)
At the PV input breaker in the electrical panelboard.
Photovoltaic point of interconnection
64-112(4)(c)
At the photovoltaic point of interconnection in the panelboard.
Photovoltaic DC disconnect marking
64-200(1)
String inverters: PV output circuit DC disconnect, at an accessible location.
Rapid shutdown at the DC disconnect
64-200(2)
At the disconnecting means for the photovoltaic output circuit.
Rapid shutdown switch identification
64-200(2) · 64-218(4)
At the rapid shutdown switch.
High voltage, DC circuits over 750 VDC
64-202(5)(c) · 64-904(2)(c)
On every enclosure containing PV source/output circuits over 750 V dc (64-202(5)(c)) and on energy storage system enclosures with dc circuits over 750 V dc (64-904(2)(c)); engrave the maximum rated circuit voltage.
Rapid shutdown initiation device locations
64-218(6)
Rapid shutdown initiation device shown on the diagram required by 84-030(2).
Rapid shutdown placard at meter and service equipment
64-218(7)
At the supply authority meter location and the consumer's service equipment location. On buildings without exterior metering the location may need to be agreed with the local fire department.
Building source and disconnect location placard
64-076(3) · 64-902(1) (also shown by SK24 under 64-218(7) and 84-030(2))
At the supply authority meter location and the consumer's service equipment.
Interconnected system warning notice
84-030(1)
At the utility disconnect and the meter location.
Photovoltaic system utility disconnect
84-030(1)
At the utility disconnect serving the PV system.
AC combiner, no other loads permitted
64-112(4)(g)(ii)
On equipment that combines AC supply circuits only (AC combiner / solar-only panelboard) with a single output overcurrent device.
Utility disconnect and rapid shutdown
64-218(7) · 84-030(1)
On the utility (supply authority) disconnect when it is also the rapid-shutdown initiating device.
AC disconnect energized from two sources
64-060(1)(h)
On an AC disconnect fed from both the PV system and the utility grid. An alternative TSASK example to 64-060-10_ac-disconnect-shock-hazard.
Main PV system AC disconnect
64-060(1)(h)
On the main PV system AC disconnect (a disconnect fed from two sources). Identification only; the 64-060(1)(h) shock-hazard warning is still required.
Adjustable OCPD, maximum rating, do not adjust
14-104(1)(b)
On an adjustable-trip breaker or fused disconnecting switch (e.g. PV AC disconnect, utility disconnect, service or feeder device) where the cable ampacity is less than the device's maximum rating. Layout: "MAX ____ A" then "DO NOT ADJUST".
Customer owned generation, disconnect switch inside (Saskatoon L&P)
84-022 / SL&P IG2022 3.1.2
On the building near the electric service entrance, when SL&P has approved an indoor location for the utility disconnect switch. SL&P may also require posted directions and/or a lockbox.

Rule numbers are printed as the source document writes them, and most provincial and utility standards were drafted against the 2021 Code. Nine Section 64 numbers changed in C22.1:24. The renumbering is here.

Saskatchewan kits

Saskatchewan solar label kits
JobPlates hereOntario
House, string inverter2021
House, microinverters1617
House with battery2425
Commercial rooftop2930
Ground mount / solar farm3132
Off-grid / cabin1516
Re-label an existing install78