Engraved in Burlington, Ontario · Ships across Canada

Cart Build your kit
Engraved PV DC disconnect plate
Alberta · municipal jurisdiction

Alberta solar label kits

Alberta adds nothing province-wide. Your municipality or utility does: the City of Edmonton, the ENMAX network and the City of Medicine Hat each have plates the CEC base set does not contain.

House, string inverter
20 plates

The same as the national base set, 273 square inches of it. Microinverters are 16 plates.

Alberta-only plates
15

12 for Edmonton, 2 for the ENMAX network and 1 for Medicine Hat.

Plates with published wording
3

ENMAX and Medicine Hat word theirs. Nothing is worded province-wide.

What Alberta's cities and utilities add

City of Edmonton, Solar PV Volume 2, section 5.12: identification and lock-out plates for the distributed generation disconnect and its overcurrent device, the legends for Edmonton's standard rapid-shutdown panels, and an inverter number. ENMAX (EPC-NPD-PG-001 s.5.5) words two plates for the main interrupting device on its network, and Medicine Hat's micro-generation guide (s.5.1.3) one for the external disconnect.

Alberta municipal and utility plates
Plate & ruleWhere it goes
Distributed generation disconnect
Good practice
At the DG disconnect: the designated lock-out/tag-out point isolating the PV system from the building electrical system.
DG overcurrent device
Good practice
On the switchgear at the upstream breaker (DG Disconnect #0).
RSD panel legend, rapid shutdown cleared (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown master panel, blue pilot light.
RSD panel legend, activated by ESTOP (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown master panel, amber pilot light (manual ESTOP).
RSD panel legend, activated by fire alarm (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown master panel, red pilot light (fire-alarm input).
RSD panel legend, PV system in operation (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown master panel, green pilot light.
RSD remote station legend, array still active (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown remote station, amber pilot light, label (ii).
RSD remote station legend, cleared, resume from main room (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown remote station, blue pilot light, label (i).
RSD remote station legend, activated by ESTOP (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown remote (slave) station, amber pilot light, label (i).
RSD remote station legend, PV system in operation (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown remote station, green pilot light, label (i).
RSD remote station legend, DC voltage exceeds 30 V (Edmonton)
Good practice
Beside the pilot light on the City of Edmonton standard rapid-shutdown remote station, green and blue pilot lights, label (ii) (one per light).
Prevent backfeed, rack out and lock out (ENMAX network)
ENMAX EPC-NPD-PG-001 s.5.5 iii
On the main service disconnect (main interrupting device), beside the red UTILITY MAIN INTERRUPTING DEVICE sign.
Utility main interrupting device (ENMAX network)
ENMAX EPC-NPD-PG-001 s.5.5 iii
On the main service disconnect (main interrupting device) of a generating customer on the ENMAX secondary network.
Inverter number (Edmonton)
Good practice
On each inverter and its AC isolation breaker or disconnect; numbered from the north-west inverter, moving east then south.
MG disconnect switch (Medicine Hat)
84-022 / City of Medicine Hat MG guide s.5.1.3
On the external disconnecting means (EDM) required by City of Medicine Hat Electric for micro-generation.

Everywhere else

Alberta's inspection is municipal or through an accredited agency, and most of them publish no solar labelling document at all. You still need every plate. The CEC base set is the whole requirement and the inspector settles the wording.

If the job is in Red Deer, Lethbridge or an agency-inspected area, tell us the authority having jurisdiction and we will flag anything on the schedule that is built by analogy rather than to a published document.

The distribution side

Alberta's wires companies each run their own micro-generation interconnection process. None of them publishes a full label set the way Manitoba Hydro or Nova Scotia Power does. ENMAX words two plates for its network; elsewhere the utility side of an Alberta kit is identification, with no prescribed text.

The short version

An Alberta kit is the national base set plus your city's or utility's plates, where it has any. Anyone selling you an “Alberta-specific” 40-plate set is selling you the base set with a province name on the invoice.

Micro-generation

Alberta's micro-generation regulation governs how the array connects and what the wires company will accept. It says nothing about what the plates say. Labelling still comes from C22.1:24 and from whoever inspects the job.

Alberta kits

Alberta solar label kits
JobPlates hereOntario
House, string inverter2021
House, microinverters1617
House with battery2425
Commercial rooftop2930
Ground mount / solar farm3132
Off-grid / cabin1516
Re-label an existing install78