British Columbia · BC Hydro & FortisBC

British Columbia solar label kits

You will read that BC Hydro fails a red tag. Its current standard does not say that — DGTIR-100 sets no colour or size for labels. Its sample drawing shows the disconnect ID labels black on white, and some inspectors ask for that. Here is what each document says.

House — string inverter
20 plates

272 square inches of phenolic. Microinverters are 16 plates.

Colour set by BC Hydro
None

DGTIR-100 Rev. 3 sets no colour or size. Our kit ships white on red; the ID labels are also cut black on white.

Verbatim wording published
None

BC Hydro sets the identifier format. It does not publish CEC plate wording.

Colour in B.C., in detail

What BC Hydro sets

DGTIR-100 Rev. 3 (July 2026) — BC Hydro's distributed generation technical interconnection requirements — asks for permanent, legible labels: a unique identifier on each DG System Disconnect (DS-DG1, DS-DG2 and so on), a “Two power source, parallel system” warning, and a label saying where the DG disconnect is. It sets no colour and no size.

BC Hydro's sample net-metering single-line drawing, marked SAMPLE, draws the disconnect ID and location labels black on white and the two warnings red. Some inspectors treat that as the expected look. FortisBC Rev. 14 applies in FortisBC territory and sets no colour either. Tell us which utility the job connects to before the kit is cut.

Where the black-on-white rule came from

The black-on-white 3.5″ × 1″ figure is from BC Hydro's NMIR R1 (2013), which has been superseded. It applied to the revenue-meter notice “TWO POWER SOURCE, PARALLEL SYSTEM”, not to the disconnect identifiers. The CEC photovoltaic warning sign stays white on red under Rule 64-200(3).

What our kit ships

White on red, the whole kit. BC Hydro’s two ID labels — DG SYSTEM DISCONNECT and DG ISOLATION VIA DG SYSTEM DISCONNECTS — are extras in the builder, cut black on white the way BC Hydro’s sample drawing shows them, for the inspectors who ask for that.

What we can and can't cite

No B.C. authority publishes verbatim wording for the CEC plates themselves. Every plate in a B.C. kit is built to your inspector's specification, using the wording published by the provinces that do publish it. We will tell you which is which on the schedule.

B.C. kits

Base set, before the utility identifiers and before anything the inspector adds on site. Ontario is shown beside it because it is the figure quoted everywhere else on this site.

British Columbia solar label kits
JobPlates hereOntario
House — string inverter2020
House — microinverters1616
House — with battery2424
Commercial rooftop2929
Ground mount / solar farm3131
Off-grid / cabin1515
Re-label an existing install77