1 · The CEC base set

C22.1:24 — 15 rules

Rule numbers are the 2024 edition. Nine Section 64 numbers moved from the 2021 edition — if your specification still cites the old number, the renumbering is here.

  1. Photovoltaic warning sign — capitals at least 9.5 mm high, white on red (64-200(3))

    64-200

    PV system disconnecting means

  2. Warning that terminals stay energized with the switch open

    64-060(1)(h)
    84-024(1)(i)

    Every disconnecting means

  3. Ungrounded conductor warnings

    64-066(7)
    64-068(1)(b)

    DC circuits — string and central inverter jobs

  4. Identification of the disconnecting means

    64-074

    Each disconnect

  5. Building supplied from other sources — site plan

    64-076(3)
    64-902(1)

    Service equipment / meter

  6. Renewable energy system contains electrical energy storage devices

    64-076(3)
    2021: 64-074(4)

    Service disconnect and meter, where storage is present

  7. Do-not-relocate marking on the overcurrent device

    64-112(4)(c)

    Panelboard with a supply-side connection

  8. Label stating the PV system is equipped with rapid shutdown

    64-218(7)

    Supply-authority meter and the consumer’s service equipment

  9. Warning that the utility disconnect's terminals stay energized with it open — the 64-060(1)(h) plate. The “DO NOT LOCK” wording is Manitoba Hydro's only: every other utility wants a disconnect it can lock open

    84-024(1)(i)

    Utility disconnecting means

  10. Interconnected photovoltaic power source marking

    84-030(1)

    Supply-authority (utility) disconnect and meter location

  11. Single-line diagram of the interconnected system

    84-030(2)

    At the service — an 11″ × 8.5″ plate

  12. Multiple power supplies warning

    14-414(3)
    64-112(4)(d)

    Panelboard fed from more than one source

  13. Arc-flash marking — “other than dwelling units”

    2-306

    Commercial and industrial only

  14. Do-not-adjust marking — “Do not adjust settings” (Manitoba TI 8-106 A)

    8-106

    Adjustable overcurrent devices

  15. Utility-interconnected inverter marking

    C22.2 No. 107.1
    Cl. 15.4.1.1

    Inverter, where not factory-marked

2 · What your jurisdiction adds

Province & utility

On top of the base set, and before the local distribution company has its say. Five provinces publish something; the rest leave the wording to the inspector.

Provincial and utility documents
JurisdictionThe document to work from
OntarioESA-SPEC-004 R1 · ESA Bulletin 64-5-4 · ESA 64-7-2
British ColumbiaBC Hydro DGTIR-100 Rev. 3 · FortisBC Rev. 14
SaskatchewanTSASK Appendix M · SaskPower ESR Rev. 3
ManitobaMB Hydro Informative Bulletin 64-0
QuébecHydro-Québec E.12-01 (2025-11-17) Annexe E · E.12-07
Nova ScotiaNSPI B-64-200, eff. 2024-07-02
Newfoundland & P.E.I.Utility interconnection standards
Base set onlyCEC C22.1:24

Full breakdowns: Ontario · British Columbia · Alberta · Saskatchewan · Manitoba · Nova Scotia

3 · Before you call for inspection

On site

Not rules — the six things that actually get a labelling deficiency written up.

  1. Every plate legible from where a person stands

    Not from a ladder, and not after the equipment door is open. If it has to be read to be useful, it has to be readable from the floor.

  2. Nothing filled in by hand

    Voltages, currents, locations and equipment IDs engraved, not written on with a marker. An inspector is entitled to refuse a Sharpie, and the ink is gone in two summers anyway.

  3. Fasteners, not adhesive, on anything outdoors

    Screws or rivets on the service, the meter and the exterior placard. Adhesive is fine indoors and unreliable through a Canadian freeze-thaw.

  4. The utility's plates present

    Hydro One, Toronto Hydro, BC Hydro, Manitoba Hydro and Nova Scotia Power each publish their own. Manitoba Hydro and Nova Scotia Power name red with white lettering; check what your inspector expects on BC Hydro ID labels.

  5. The rapid-shutdown label at the meter and the service

    Rule 64-218(7): a label stating the system is equipped with rapid shutdown, at the supply-authority meter and at the consumer's service equipment. The most commonly missing plate on a finished residential job.

  6. Wording checked against the current revision

    Nova Scotia Power's DC conductor sentence changed on 2024-07-02. ESA 64-1-4 and 64-6-1 are superseded. A stale catalogue engraves a plate that was correct two years ago.

What this sheet is not

It is a reference, not an approval. It does not replace the drawings, the manufacturer's instructions or the inspection, and no plate — ours or anyone's — is code compliant, CSA approved or guaranteed to pass on its own. Certification attaches to equipment and to the installation as it is inspected. Check the current edition of C22.1 and your provincial amendments before you rely on any citation here.