Solar label kit pricing
Per plate: a charge for each plate, plus a rate on the area it is engraved on. So the kit price follows the job rather than a package tier, a conduit marker costs a fraction of a diagram plate, and taking a plate off takes its price off with it.
There is no setup fee and no minimum order, and you don't need an account. One disconnect tag is a real order and it still gets cut.
Build your kit on this site and the price is on the last screen, in full, with tax, before you send anything.
Seven jobs, seven kits
Straight out of the kit builder, for Ontario. In another province the plates change, and the area and the price change with them.
| Job | Plates | Engraved area |
|---|---|---|
| Re-label an existing install | 8 plates | 165 sq in |
| Off-grid / cabin | 16 plates | 183 sq in |
| House, microinverters | 17 plates | 284 sq in |
| House, string inverter | 21 plates | 287 sq in |
| House with battery | 25 plates | 350 sq in |
| Commercial rooftop | 30 plates | 468 sq in |
| Ground mount / solar farm | 32 plates | 572 sq in |
Custom sizes, colourways and mounting hardware quoted on request. What your province changes →
Four sizes cover most of the job
The common sizes, drawn to scale against each other so you can compare them. Area is most of what moves a plate's price: a 4″ × 1″ equipment tag has about a twenty-third of the area of an 11″ × 8.5″ diagram plate, and the diagram plates are cut that size because of how much has to fit on them.
STORAGE DEVICES
Two tiers on every kit
Both tiers carry every plate the rules ask for. The difference is whether you take the reductions the rule text itself allows.
Standard: the full set
Every placement the code and the utility standard call for. This is what you send when someone else’s inspector is going to look at it.
Minimum: only what the code permits
The same kit with the reductions the rule text itself allows, each with a citation behind it. Every plate the rules ask for stays in. Two mechanisms:
- Consolidation the rule allows. On a microinverter job, ESA Bulletin 64-5-5 A11/A12 lets the system ratings go on the 84-030(2) single-line plate instead of a separate plate. That alone removes one of the biggest plates in the kit.
- Collapsing meter-and-service-equipment pairs where the meter and the service equipment are genuinely one location.
Where the two tiers differ on an Ontario job it is a handful of plates. Most of the kit is the same.
A grid-tied kit does not get much below the eight-plate service set. Most of what is left after that is the two diagram plates: the single-line and the first-responder placard. They are big because of how much has to fit on them.
Getting below that means a stock kit rather than a made-to-order one: no layout or proofing per job, and several kits cut from one sheet so the setup is shared. That is a pricing decision and the Code has no say in it. Ask if it would help.
Every label, with the rule behind it, the province it is for and where on the job it goes. A nested cut sheet. And a list of every blank we still need from you before anything is cut (ratings, locations, equipment IDs), with a flag on anything only your local utility or your inspector can confirm.